Hassle free Service!

We worry about the details so you don't have to

We have attended such a wide variety of events since we have been operating. We can draw from this experience to provide you with a railway with no worries. We take care of the build up and knock down, risk assessment and operation. All we require from you is patch of level ground to lay our tracks. This can be hardstanding or smooth grass.

 

 

Key Facts

2 hours

Set-up time

150 Meters

Length of Track

2 meters

Minimum width of pitch

1 in 30

Maximum Gradient

3 to 5 minutes

Length of Ride

16 Passengers

Train capacity

The Smaller Print

Stuff that should also be considered!
  • Our kit is big, it cannot be carried! We must have access with the van and trailer on to site to directly unload the railway. We must also consider ground conditions for driving on.
  • Steam engine use water, we must have a supply of water for busier events (around 20l per hour) This should be discussed prior to the event. Otherwise we are self sufficient
  • In tinder dry conditions there might be a risk imposed by the use of our steam engine, if this is the case it might be necessary to substitute our petrol engine on occasion.
  • We make every possible effort to provide steam but sometimes it might be necessary to run our small diesel to supplement the steam engine. 

©Copyright. All rights reserved.